Problems: Paving operations. Roadway reduced to one lane Location: STATE HWY A1A Both NB/SB between HWY 105/HECKSCHER DR and LONG POINT DR Lanes Impacted: ON-GOING RESURFACING PROJECT ON HECKSCHER DRIVE, BETWEEN THE FERRY SLIP AND THE NASSAU COUNTY LINE. Reported on 1/6/2009 8:45:01 PM
Problems: Paving operations Location: HWY 21 Both NB/SB between COLLINS RD and HWY 134/103RD ST Lanes Impacted: SINGLE LANES CLOSED FOR PAVING OPERATIONS. SLOW DOWN AND WATCH FOR DOT WORKERS. Reported on 1/6/2009 8:45:01 PM
Problems: Long-term road construction Location: US 17/US 92 Both NB/SB at DOCTORS INLET BRG Lanes Impacted: DOCTOR'S INLET BRIDGE WIDENING PROJECT. EXPECTED TO FINISH - WINTER 2010. WATCH FOR LANE CLOSURES AND DELAYS DURING NON-RUSH HOURS. Reported on 1/6/2009 8:45:01 PM
Problems: Road construction. Right lane closed Location: HWY 113/HWY 9A NB between DAMES POINT BRG and DAMES POINT BRG NORTH Lanes Impacted: RIGHT LANE OVER THE DAMES POINT BRIDGE CLOSED UNTIL THE SPRING OF 2009 FOR BRIDGE REPAINTING. Reported on 1/6/2009 8:45:01 PM
Problems: Road construction. Right lane closed Location: HWY 228 EB between ALCOY RD and CHAFFEE RD Lanes Impacted: ONE EASTBOUND LANE OF NORMANDY CLOSED BETWEEN NEW WORLD AVENUE AND CHAFFEE ROAD FOR LONG TERM CONSTRUCTION. Reported on 1/6/2009 8:45:01 PM
© 2009 Newport Television LLC |
Site Map |
Terms Of Use |
Privacy Statement |
Copyright & Trademark Notice |
EEO